UPGRADING A WASTEWATER TREATMENT SYSTEM FOR A DAIRY INDUSTRY

Project description and scope

Completed in April 2017, this contract consisted of the construction of a new building addition, the installation of new underground sewer pipes, and the design and installation of a new sewage treatment system. EnviroFix provided the following services: engineering design, liaising with regulatory bodies,  obtaining construction permits, project management of the construction of a new building addition to the existing plant and installation of a new wastewater pre-treatment system. 

Project deliverables

EnviroFix successfully completed the following tasks:

  • Management of the construction of a new building addition 140m2 in size
  • Construction of an upgraded main and lateral sewers
  • Connection of sewers to the municipal system
  • Installation of a grease and sediment interceptor
  • Underground installation of a new lift station
  • Balancing silo installation
  • Installation and operation of a pH neutralisation system
  • Installation of a process control system